This is a new 112’ long shoreline parallel dock/deck with entry and exit sidewalks at both ends that we recently designed and completed.  It features a 4500# capacity Platinum Series boat lift equipped with solar battery chargers for the vessel, 2 - 3000# capacity PWC lifts, Gossen™ vinyl decking and premium white double braided nylon rope rail and white vinyl piling caps.  All outer framing is covered and finished with 1/2” vinyl skirting and completed below the framing with white vinyl lattice work. The pilings are also custom fluted with 1/2” vinyl for a fully trimmed and finished product. It also features a custom kayak stepped down platform and launch, kayak and paddleboard storage mounts, retractable fish cleaning station and a lighting package that creates an impressive nighttime look.  We spared no effort on the creativity and craftsmanship on this project. Six large pilings were installed on the center dock for a future 16,000# lift.