This is our installation of a new commercial seawall for the Marina at River Run in Sebastian, Florida. It features 550 series Shoreguard Vinyl sheet pilings driven to a 15’ embedment and an 18” x 24” concrete cap. The tieback rods are 1” diameter steel encased in fully grouted 6” PVC sleeves and are connected to a continuous 30” x 12” footer with an embedded steel mat. The project also includes a new dock/ boardwalk adjacent to the new seawall. |








|
Cap steel, footer steel and sleeved 1” diameter tieback rods are in place and preparations for the final pour are underway. |









|
Cap forms are stripped and backfill is underway |







|
Parking lot is poured and striped for completion |


|
Some before and after shots |



|
Dock is installed |
|
Brevard Co. Cert. # M1-1233 Indian River Co. Cert. # 12308 Monroe Co. Cert. # ENG II 297C |