We installed a new replacement vinyl seawall on this property in Sunnyland Beach  featuring 425 series Shoreguard™ vinyl sheet pilings with a boardwalk cap featuring Gossen™ Tuscan Cherry™ vinyl decking.  We also installed a new dock, boathouse and boathouse mounted lift featuring a 7000# capacity Platinum Series™ lift from IMM™ Boatlifts.  The seawall cap and dock decking, also Gossen™ Tuscan Cherry™, are     integrated together to form a consistent flow from seawall to dock and allows the     seawall cap to provide additional deck space for the dock.  This is a classic Land and Sea Marine design that works very well for the avid boater on canal front property.

Before

After

The dip in the sod grade is a Brevard County required runoff retention swale

Before

After

Our return wall will protect our client’s property from soil loss independently

from the surrounding conditions

This Gossen™ Tuscan Cherry™ vinyl decking will provide years of maintenance free service with a truly unique and authentic look of real stained hardwood.

This dropped down finger pier of the seaward side of the slip provides easy access to the boat for safe loading and unloading.