This is a replacement installation of an 90’ vinyl seawall in Melbourne Beach featuring 325 series Shoreguard™ vinyl sheet pilings, a 4x6 timber whaler with 5/8” stainless steel tie back rods and a boardwalk cap featuring Gossen™ vinyl decking. Two 5’ return walls were installed at the property lines to retain all runoff into the drainage swale. This is an outstanding solution for canal front shoreline armoring and stability.

Before

After

Before

After

5’ return walls for drainage retention

Gossen™ vinyl decking provides a superior look and lifespan for this seawall cap